ā片在线观看,无码人妻精品一二三区免费,国产精品一国产精品,亚洲伊人色欲综合网

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://sxfxcm.com

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

国产免费av片在线观看播放| 天堂新版在线资源| 无码gogo大胆啪啪艺术| 99久无码中文字幕一本久道| 久久av高潮av无码av喷吹| 亚洲国产精品特色大片观看完整版| 无码丰满少妇2在线观看| 国产免费av片在线观看播放| 久久精品国产精品亚洲精品| 麻豆亚洲av永久无码精品久久| 国产精品久久久久久吹潮| 精品久久久久国产免费| 国产精品无码久久久久| 国产va免费精品观看精品| 一本大道av伊人久久综合 | 亚欧免费无码aⅴ在线观看| 免费无码又爽又刺激高潮的视频| 国产精品无码专区在线观看| 国产精品久久婷婷六月丁香| 伊人激情av一区二区三区| 国产av永久无码天堂影院| 国产熟女一区二区三区四区五区| 欧美成人精品第一区二区三区| 国产精品亚洲一区二区在线观看| 亚洲欧洲日产国产 最新| 欧美freesex黑人又粗又大| 亚洲国产精品无码久久98| 国产18禁黄网站免费观看| 精品丝袜人妻久久久久久| 吃奶呻吟打开双腿做受在线视频 | 精品人妻一区二区三区四区在线| а天堂中文地址在线| 国产麻豆一精品一av一免费| 欧美性巨大╳╳╳╳╳高跟鞋| 亚洲色大成网站www永久| 人妻 丝袜美腿 中文字幕| 激情人妻另类人妻伦| av无码国产精品色午夜| 成人精品一区二区三区中文字幕| 久久久久亚洲av无码专区| 日韩毛片无码永久免费看|